DERRICK ARREDONDO

Logo

secretary I would organize data

Hutchinson, MN

DERRICK ARREDONDO
ResumeID: 2949161 723 Ivy Lane S.E.
Hutchinson, MN 55350
(320) 288-8266
derrickarredondo29@gmail.com

OBJECTIVE
Obtain employment in production atmosphere.

JOB HISTORY/DUTIES
3rd shift burger dept.
Jennie-o
Willmar
Start Date: 05/2014 End Date: 07/2015
I was working in a cold environment and responsible for setting up the machine for the product that they
were running the night also making sure I had the right spices to put in there product .I was train in lock
out tag out procedures .I would also work on the production line helping them get there quota for the night
there also been times where I would palletize and triple check the labels on the patties and boxes making
sure they had the right number.

Farming,general labor,heavy operator
Svor Farming
Benson
Start Date: 04/2014 End Date: 07/2015
I was responsible for many different tasks such as planting in the fields also plowing prepping them for
next year. I would use a loader to load and unload a dump truck with gravel dirt rock etc. . I have
carpentry skills because I was helping build a pull barn.

Food service,Clerical
Lino lakes
Lino lakes
Start Date: 9/2010 End Date: 3/2014
I was responsible for making sure the dishes were sanitize by running them through the dish washing
machine. I was required to work at a fast pace and help train the new hires. I obtain another job as a
secretary I would organize data, problem solve conflicts within the treatment atmosphere and
communicate with my fellow peers on different ways to challenge there old ways of thinking.

1st shift Sanitation
Seneca
Glencoe
Start Date: 6/2010 End Date: 8/2010
I had to work well as a team at a fast pace to clean and sanitize all the machine in one of there
department before the next production day started.

3rd shift Production worker
Jennie-O Turkey Store
Willmar
Start Date: 04/2009 End Date: 12/2009
I would unrack there products and place it on the cutting table to be process and sealed through a
machine. I also worked in the warehouse running a label machine then I would inspect the number to be
accurate for the production day after that I would palletized to be shipped out. I adapted to working in a
fast pace environment learning the many jobs I was acquired to learn for that department.

2nd shift Metal fabricator
Aero tek -Parker Brothers
Chanhassen
Start Date: 04/2008 End Date: 08/2008
I was to inspect the hydraulic blocks for metal shaving then deburr them by using different hand tools to
remove the shavings then I would run them through another machine to grind and buff the many different
pieces for the hydraulic blocks and finally I would check the valves for any defect before they went to the
paint booth for a final coating before they were shipped out.

1st shift Assembly/Wood Cabinetry
Aero Tek- Plato Woodwork
Plato
Start Date: 01/2007 End Date: 06/2007
I worked on the production line inspecting panels , doors , shelves , cabinets for any defects then if I found
some I would have to grind and sand them down. Then they were sent to a paint booth to be spray again.
I work in a paint booth spraying stain on the panels , doors , shelves, cabinets and wiping the stain off and
sending them on line to go through there ovens to be dried then inspecting again before they get the final
seal coating.

3rd shift Food Production
Micheal Foods Inc.
Gaylord
Start Date: 10/2005 End Date: 4/2006
I was a machine operator that had to check the weight of there product before they were shipped to the
warehouse. Then every 72 hours we had to take apart the machine to get it washed and sanitized then
assemble it after inspection passes we were required to set it up for the next shift production.

EDUCATION

Major: Highschool Diploma
Glencoe Silver Lake High School ALP, MN

Major: Welding
Ridgewater, MN

  • Updated 8 years ago

To contact this candidate email derrickarredondo29@gmail.com

Contact using webmail: Gmail / AOL / Yahoo / Outlook

This entry was posted in . Bookmark the permalink.