Kevin.G.Young
(122 Rogers Ln Des Allemands La ,70030) (985-381-8082) | (kevyoung31@live.com)
Summary
• 35 years in the Petroleum Construction Field (8 years in QA/QC inspection) (6 years as a Construction Supervisor ) ( 21 years as a Pipe welder & Pipe fitter ) With the ability to work from Piping Isometric drawings ,Structural drawings, Piping P&IDs…Working experience in Fabrication yards ,Onshore & Offshore pipeline’s, Refinery’s, Gas Plants, Offshore Structures, FPSO’s, Power Plants…
•
Certifications
American Welding Society Certified Welding Inspector # 13111519 DOB: 12/01/61
ANST ACCP level II #224643
ABS : Welding Inspections and Non-Destructive Evaluations #USA13MIN0103320
NACE CIP1 Coatings Inspector
I also hold a United States Patent # D 540,372 for Pipefitters and Plumbers Calculator
•
Software Programs
• Computer skills, Microsoft Office Word., Excel, Power Point, ADOBE PRO 11, Share point, Coreworx…
1.
• Experience in full onsite QA/QC inspection for Welding & Coatings & Civil work Construction Supervision ,and all phases of Fabrication & Installation, Effectively schedule monitor witness & review all aspects of RT ,UT,VT,MT,NDT & NDE procedures and documentation … Experience working with Codes Specification’s & Standards ASME B.31.3, B31.1, B.31.4, SEC IX API 1104, 570, 510 AWS D.1.1 5.1 thru 5.5 ANST ,NACE MR-0175, ISO 9001 …Experience in Complete QA/QC documentation setup … Works effectively with Project Manager’s, Engineer’s
SKILLS
Experience
Dec 2013 to August 2015
• QA/QC Lead Inspector Chevron MCP Mafumeira SUL Project Onshore Pipeline. (Malongo Angola)
• ABS Consulting, Houston, TX
• Project consisted of an 18” pipeline into Gas Plant & Storage facilities and installing Strainer Skid a Pig Receiver and Header in a H2S plant environment, Insuring Contractors QA/QC program meets CVX specs and Control Schedule, monitor, and inspect all of contractors work from Fabrication to commissioning. Maintain all Welding & Hydro test ,coatings procedures, Track Dailey progress of contractor, and control QA/QC NCR’s Issues, RT film Interruption, assist in Material Traceability control, Insure that all fabrication is to Chevron Project Specification’s , assist in all aspects of Safety and attend Company Management Meetings with contractor Reference: Larry Oden Project Manager Chevron larry.oden@chevron.com
Mar 2012 to Mar 2013
• QA/QC Inspector Chevron FE group, (Malongo, Angola)
• Applus Velosi , Houston ,TX
• Start & Put into Place QA/QC program for FE group for Chevron. Insure that all fabrication is to Chevron Project Specification’s Control Schedule, monitor, and inspect all work from Fabrication to Coatings to commissioning. Maintain all Welding & Hydro test procedures, Track Dailey progress of contractor, and control QA/QC Issues, assist in Material Traceability control, assist in all aspects of Safety…
Oct 2007 to Feb 2012
• Construction QA/QC Inspector Chevron AAGM MCP FARM Project (Angola)
• Swift Technical Group Houston, Texas
• Daily Control of Schedule, monitor, and inspect all work from Fabrication to commissioning. Maintain all Welding & Hydro test procedures, Track Dailey progress of contractor, and control QA/QC Issues assist in Material Traceability control assist in all aspects of Safety : Reference: Larry Oden Project Manager Chevron larry.oden@chevron.com
JAN-05
FEB-06
• Piping Superintendent and QC Supervisor EPC4A Project (Choba, Nigeria)
• Willbros International, Houston, Texas
• Responsible for the Workforce, coordinate Revisions with Engineers, all welding procedures Job Materials ,Morning Safety and Pre job Meetings, and Schedules of Job Progress, and Quality Control Issues
NOV-03
JAN-05
• Superintendent Shell Projects Bonga FPSO project (Offshore Nigeria)
• BAY LTD Offshore, Amelia, Louisiana
• Responsible for the Workforce, coordinating Dailey work scope, Job Materials, Morning Safety and Pre job Meetings, Tracking of Job Progress percentages, Assist with Commissioning of Systems
1.
Education
• 1983 Louisiana High School Equivalency Diploma
• 2013 AWS Certified Welding Inspector Seminar 36 hours Certificate
• 2012 2010 Real Educational Services CWI Preparatory 136 hours Certificate’s
• 2015 OSHA Outreach Training Program- Construction
• 2015 TWIC Card
Major Projects Worked
• Dominion Oil- Devils Tower Deepwater Spar Hook up 2003
• Trunk Line / Texaco- Gas Plant New Compressors Plant Upgrade in Larose LA 97”
• Forcenergy Production -Maintenance & Refurbish HI 552 SMI 11 1995,97”
• Willis G Helis Oil—Black Bay SWD Project 1993 94
• Total Minetone—Eloi Bay Field SWD Project 1992 93”
• Chevron USA -West Delta 117 field Upgrade 1991
• Mobil oil Chalmette Refinery -new Plant Addition 1991
• Louis Rich Turkey Processing Plant -New Construction Tulare ,Ca 1988 89“
• Pacific Ultra Power -New construction Cogeneration Power Plant Placerville, CA 1986,87”
• Pacific Ultra Power -New construction Cogeneration Power Plant Chinese Camp CA 85,86
• Gulf Oil Alliance Refinery -Belle Chasse new addition to plant north & Incoming pipeline 1984 to 85
• Conoco -New platform hookup Main Pass 311 –A & B / MP-296 –B & C & D 1980 TO 84
C/V Resume
C/V Resume
KGY 2014
Page 2
To contact this candidate email kevyoung31@live.com