Project: J.Givoo at Ginna Nuclear Plant 04/21/17 to present
Function: I&C Tech – General repair and calibration.

* 04/19/17 to 4/20/17 Unemployed.

Project: J.Givoo at Fermi Nuclear Plant 03/13/17 to 04/18/17
Function: I&C Tech – Turbine crew.

* 11/03/16 to 03/12/17 Unemployed.

Project: Crane Valve at D.C.Cook Nuclear Plant 10/03/16 to 11/02/16
Function: AOV FSE Crane Valve Testing

* 4/26/16 to 10/02/16 Unemployed.

Project: Crane Valve at D.C.Cook Nuclear Plant 3/21/16 to 4/25/16
Function: AOV FSE Crane Valve Testing

* 11/08/15 to 3/21/16 Unemployed.

Project: J.Givoo at Fermi Nuclear Plant 09/14/15 to 11/07/15
Function: I&C Tech – Turbine crew.

* 05/18/15 to 09/14315 Unemployed.

Project: J.Givoo at Ft Calhoun Nuclear 03/30/15 to 05/17/15
Function: I&C Tech – LLRT testing – Flowscanner valve testing

* 10/27/14 to 03/30/15 Unemployed.

Project: J.Givoo at Comanche Peak 09/09/14 to 10/26/14
Function: I&C Tech Testing and calibration

* 04/22/14 to 09/09/14 Unemployed.

Project: Crane Nuclear at Comanche Peak 03/24/14 to 04/22/14
Function: AOV FSE Viper Valve testing.

Project: J. Givoo at Fermi Nuclear 02/03/14 to 03/21/14
Function: I&C Tech FIN team / Security Systems

*12/01/13 to 02/02/14 Unemployed.

Project: AMES at Shearon Harris Nuclear 10/28/13 to 12/01/13
Function: Senior I&C Tech feed water heater controls project.

Project: AMES at St. Lucie Nuclear 09/30/13 to 10/20/13
Function: AOV Senior Valve Tester using Fisher Flow Scanner .

* 05/21/12 to 09/29/13 Unemployed.

Project: Crane Nuclear at Columbia Nuclear 05/06/13 to 05/21/13
Function: AOV Senior Valve Tester using Crane Inifinity test System.

Project: Crane Nuclear at D C Cook Nuclear Plant 03/18/13 to 4/24/13
Function: AOV Senior Valve Tester using Crane Viper 20 test System.

Project: Crane Nuclear at Wolf Creek Nuclear Plant 01/07/13 to 03/08/13
Function: I&C AOV Test Analyst.

* 11/10/12 to 01/06/13 Unemployed.

Project: Crane Nuclear at Cooper Nuclear Plant 10/01/12 to 11/09/12
Function: AOV Senior Tester using Crane Viper 20 test System.

Project: J. Givoo at Ft Calhoun Nuclear 07/19/12 to 09/29/12
Function: I&C Tech survelance and LLRT.

* 04//18/12 to 07/16/12 Unemployed.

Project: Crane Nuclear at D.C. Cook Nuclear 03/12/12 to 04/18/12
Function: Viper 20 valve testing.

* 12/23/11 to 03/12/12 Unemployed. Death in Family 01/14/12

Project: J. Givoo at Grand Gulf Nuclear 12/05/11 to 12/23/11
Function: I&C Tech supporting refueling outage.

Project: J. Givoo at Ft Calhoun Nuclear 10/31/11 to 12/02/11
Function: I&C Tech supporting refueling outage.

* 10/01/11 to 10/30/11 Unemployed.

Project: J. Givoo at Ft Calhoun Nuclear 09/06/11 to 09/30/11
Function: I&C Tech supporting refueling outage.

* 04/25/11 to 09/06/11 Unemployed.

Project: Crane Nuclear at Ft Calhoun Nuclear 04/18/11 to 04/25/11
Function: I&C Tech supporting refueling outage.

Project: Crane Nuclear at Cooper Nuclear Plant 02/21/11 to 04/16/11
Function: AOV repair, Calibration, and Testing using Crane Viper 20 test System.

* 11/02/10 to 02/20/11 Unemployed.

Project: Crane Nuclear at D C Cook Nuclear Plant 09/27/10 to 11/02/10
Function: AOV repair, Calibration, and Testing using Crane Viper 20 test System.

* 04/16/10 to 09/27/10 Unemployed.

Project: Crane Nuclear at Comanche Peak Nuclear 03/29/10 to 04/16/10
Function: AOV repair, Calibration, and Testing using Crane Viper 20 test System.

Project: Crane Nuclear at DC Cook Nuclear 02/22/010 to 3/26/10
Function: AOV I&C repair, Calibration, and Testing using Crane Viper 20 test System.

* 12/07/09 to 03/22/10 Unemployed.

Project: J. Givoo at Ft Calhoun Nuclear 10/21/09 to 12/06/09
Function: I&C Tech supporting refueling outage.

Project: AMES at Kewaunee Nuclear 09/21/09 to 10/16/09
Function: AOV I&C Tester using Fisher FlowScanner 6000 and Viper 20 test systems.

* 06/16/09 to 09/21/09 Unemployed.

Project: AMES at Columbia Nuclear 05/29/09 to 06/15/09
Function: Senior AOV I&C Tester using Fisher FlowScanner 5000 and 6000 test systems.

Project: Crane Nuclear at DC Cook Nuclear 03/09/09 to 4/25/09
Function: AOV repair, Calibration, and Testing using Crane Viper 20 test System.

* 11/13/08 to 03/08/09 Unemployed.

Project: Crane Nuclear at Oyster Creek Nuclear 11/04/08 to 11/12/08
Function: AOV I&C repair, Calibration, and Testing using Fisher Flowscanner 6000 test system.

Project: Crane Nuclear at South Texas Project Nuclear 09/15/08 to 10/12/08
Function: AOV I&C repair, Calibration, and Testing.

* 0428/08 to 09/14/08 Unemployed.

Project: Crane Nuclear at Cooper Nuclear 04/19/08 to 04/27/08
Function: AOV repair, Calibration, and Testing using Crane Viper Test System, general I&C work.

Project: Crane Nuclear at D C Cook 03/17/08 to 04/17/08
Function: AOV repair, Calibration, and Testing using Crane Viper Test System, General I&C work.

* 10/19/07 to 03/16/08 Unemployed.

Project: Crane Nuclear at D C Cook 09/10/07 to 10/19/07
Function: AOV repair, Calibration, and Testing using Crane Viper Test System.

Project: AMES at Monticello 03/05/07 to 04/17/07
Function: Senior AOV Valve Tester using Crane Viper test system.

* 11/19/06 to 03/04/07 Unemployed.

Project: Newport News Ind. at Cooper Nuclear 10/19/06 to 11/18/06
Function: AOV repair, Calibration, and Testing using Crane Viper Test System.

Project: Crane Nuclear at D C Cook 09/11/06 to 10/17/06
Function: AOV repair, Calibration, and Testing using Crane Viper Test System.

* 04/24/06 to 09/10/06 Unemployed.

Project: Crane Nuclear at D C Cook 03/20/06 to 04/23/06
Function: AOV repair, Calibration, and Testing using Crane Viper 20 Test System.

* November 2005 to March 2006 Unemployed

Project: Crane Nuclear at Palo Verde 09/26/05 to 11/20/2005
Function: AOV repair, Calibration, and Testing sing Crane Viper 20 Test System.

Project: NACES at Port Arthur Steam & Energy 07/21/05 to 8/10/05
Function: Field inspection – As built loop drawings – Verification of control wiring – Testing.

* 04/27/05 to 07/20/05 Unemployed

Project: Atlantic Group at D.C.Cook 03/21/05 to 4/26/05
Function: AOV Valve testing using Fisher Flow Scanner and Crane Viper 20 test units.

Project: TMP Worldwide. at Fort Calhoun 2/21/05 to 3/19/05
Function: LLRT Leak rate and drop testing of containment penetrations, valves, and piping.
Maintenance, repair, and calibration of various plant control and I&C systems.

* Nov 25, 2004 to Feb 20, 2005 Unemployed

Project: AMES at Fermi 2 Nuclear Plant 11/3/04 to 11/24/04
Function: I&C Tech – Calibration and repair work on control equipment during refueling outage.

Project: Atlantic Group at D.C.Cook 9/27/04 to 10/31/04
Function: AOV Valve testing using Fisher Flow Scanner and Crane Viper 20 test units.

* Oct 10, 2003 to Sep 26, 2004 Unemployed

Project: TMP Worldwide. at Fort Calhoun 9/27/03 to 10/11/03
Function: LLRT Leak rate and drop testing of containment penetrations, valves, and piping.
Maintenance, repair, and calibration of various plant control and I&C systems.

* Jun 20, 2003 to Sep 26, 2003 Unemployed

Project: Caliper Inc at Bayer Pharmaceutical 5/26/03 to 6/21/03
Function: Instrument & controls maintenance and repair during maintenance turnaround.
Troubleshooting and checkout of DCS control system.

Project: Atlantic Group at Perry Nuclear Power 4/14/03 to5/14/03
Function: Instrument tubing , I&C maintenance, calibration, and repair during refuel outage.

Project: AMES at Fermi II Nuclear Plant 3/5/03 to 4/12/03
Function: General I&C maintenance and repair during refuel outage.

Project: Hudson Global at Fort Calhoun power 5/5/02 to 5/02
Function: Instrument and controls (I&C) maintenance and repair during refuel outage.

Project: Caliper Inc. at Ginna Power 3/ 02 to 4/02
Functi Instrument and controls maintenance and repair during refuel outage.

Project: Caliper Inc. at Fermi II 10/01 to 11/ 01
Instrument and controls maintenance and repair.
Worked on the “Work It Now” team to address emergent I&C problems

Project: Integrated Technical Solutions. at Detroit Water Dept. 2/01 to 10/01
Instrument and controls maintenance and repair at the Service Control Room. Quindar and Bristol telemetry equipment along with installation and programming of Westronics SV-1000 Data recorders.

Project: Onsite Co. at Detroit WWTP 10/00 to 1/01
Functi Instrument and controls field engineer for DCS upgrade. Field instrument verification, conduit and wire schedules, with some AutoCad LT work required. P&ID’s, documentation of defective conditions, and generation of loop drawings were some of my responsibilities.

Project: D.C.Cook at Bridgeman MI. 11/99 to 10/00
Functi Working as in house I&C tech doing general calibration and testing of process controls for restart of units one and two. Surveillance Testing, Troubleshooting, Repair, and Modification of various types of process controls systems.

Project: Aerotek at Birmingham, Alabama. 6/98 to 6/99
Functi Working at Raytheon on Process controls Year 2000 project for Kraft foods. Job includes constructing and maintaining computer databases and spreadsheets, examining PLC program codes for year compliance, and field inspection of various automated production systems to verify Y2K readiness. Writing remediation procedures for equipment that would not comply with Y2K. Preformed field remediation of computer systems and equipment

Project: Newmanco at Midland, Michigan 4/98 to 6/98
Functi 5 week Instrument & Controls Course given by Midland Power Company at their Midland, Mi. training facility. Course covered principles of Flow, Pressure, and Volume measurements. This was in preparation for a temporary job in Pennsylvania that was canceled at the end of our training.

Project: Cataract Inc. Aug. 1997 to Nov. 1997
Functi Worked at River Bend Nuclear Power Plant in Louisiana and at Sequoyah Power Plant in Tennessee as a controls technician during short term outages.

Project: Beloit Paper Machine Corp. Mar. 1997 to July 1997
Functi Controls Engineer. Allen Bradley PLC 5 programming, Field service and commissioning of paper making machinery. Testing and repair of electronic, pneumatic, and PLC control cabinets.
Also preformed systems walkdown and inspection prior to start-up.

May. 1995 to Mar.1997 Attending Del Mar College, Corpus Christi, Texas for associates degree in Instrumentation Controls Technology.

Project: Various Nuclear Power Plants. (Start-up and Outages) April 1982 to May 1995
Function: I&C Start-up Engineer, Lead technician, Procedure Writer.
PLC programming and debugging on Allen-Bradley PLC 5 systems. Limited mostly to digital relay logic. Vibration monitoring maintenance and calibration.

Project: Various Petro-chemical Plants. (Turnarounds) April 1982 to 1994
Function: I&C maintenance technician during plant shutdowns.
Work included troubleshooting, repair and calibration of various controls systems as referenced to Instrument specs, P&ID, and Loop Drawings

Project: Saudi Arabia and Venezuela for Flour Corp. Sept. 1980 to May. 1982
Supervisor over I&C systems at Petro-chem plants during the construction, start-up, and turn over to client.

Project: North Sea Production Platform for Brown and Root Aug. 1979 to May. 1980
Functi Responsible for construction, commissioning, calibration, and turnover of various I&C control systems on an oil and gas production platform in the North Sea.

Software Skills: DOS, MS Windows, MS Word 6, MS Excel, MS Access, Icom, RS View
RS Logic 5, AutoCad 2000i Lt, Bobcad CNC
Other computer skills include PC repair and configuration.

Education: High School Grad. 1966.
Cleveland Institute of Electronics. Grad. (1968)
Del-Mar College. Instrumentation & Controls Technology (1997)
Process Controls Training Course (5 weeks) at Midland Training Center (1997)
RS Logic 5 and RS View 32 Training by Rockwell (1998)
In-house I&C training at D. C. Cook Nuclear (1999)
Viper Valve Testing Training at Crane Nuclear (2005 – 2006)

Allen-Bradley PLC Tracor-Westronics Honeywell
Icom Westinghouse Ludlum
Masoelian Rosemont Leeds & Northrup
Beckman Eberline Ashcroft
Magnetrol Foxboro Tektronics
Barton General Electric Fisher Controls
Fisher-Porter Data Precision Texas Instruments
AOV IBM PC Square-D
RS View RS Logic Quindar Telemetry
Fisher FlowScanner Crane Viper Fisher ValveLink

William E Lee N5WRX 361-563-1303
1325 Nile Dr. Corpus Christi, Texas. 78412 Page 7

“Facts set forth in this document are true and complete”

  • Updated 6 years ago

To contact this candidate email n5wrx@stx.rr.com

Contact using webmail: Gmail / AOL / Yahoo / Outlook

This entry was posted in . Bookmark the permalink.